OFFSHORE OIL-WATER SEPARATION

Compact separation and control packages configured around platform space, fluid properties, and downstream treatment requirements.

DEFINE THE SYSTEM AROUND THE MEDIUM + DUTY

Produced fluid or crude is conditioned at the inlet and separated in the vessel. Coalescing internals or an electric field can be added where fine droplets require further growth.

PROJECT CONSIDERATIONS

OFFSHORE PLATFORMS & FPSO

INLET CONDITIONING + GRAVITY SETTLING

INTERFACE CONTROL + CONTINUOUS DRAINAGE

PACKAGE EQUIPMENT + RETROFITS

SYSTEM APPROACH

CONSIDER EQUIPMENT, PROCESS + CONTROL AS ONE BOUNDARY

Produced fluid or crude is conditioned at the inlet and separated in the vessel. Coalescing internals or an electric field can be added where fine droplets require further growth.

Equipment arrangement, throughput, hazardous-area class, maintenance access, and control interfaces must be confirmed for the specific platform.

Final configuration follows the project data sheet, technical agreement, and approved documents; website content does not replace engineering selection.

PROJECT VALUE

ENGINEER THE DETAILS FOR STABLE OPERATION

Clear inlet conditions, outlet targets, and control boundaries reduce the risk of equipment selection drifting away from the actual duty.

Sampling, draining, cleaning, maintenance, and abnormal-condition protection should be considered during design.

Retrofit projects also require confirmation of tie-ins, shutdown windows, plot constraints, and hazardous-area classification.

COMMON PROJECT QUESTIONS

What information should be provided first?+

Provide the medium, throughput, pressure and temperature range, inlet conditions, outlet targets, site utilities, and project stage.

Can the equipment be retrofitted into an existing unit?+

A retrofit can be assessed after confirming tie-ins, available space, shutdown window, control system, and existing equipment condition.

Are website values guaranteed performance?+

No. Guaranteed values are defined in the project data sheet and contract technical agreement after clarification.

Can controls be included?+

Instrumentation, valves, local controls, and DCS / SIS interfaces can be configured within the agreed supply boundary.

What delivery documents are available?+

The document scope can include drawings, data sheets, inspection records, test reports, operation and maintenance information, and packing lists.

How is delivery timing established?+

Schedule depends on technical input completeness, design approval, procurement, manufacturing, inspection, and transport conditions.