CRUDE OIL SEPARATION EQUIPMENT

Electric-field coalescence and gravity settling remove dispersed water and provide more stable feed for downstream refining.

DEFINE THE SYSTEM AROUND THE MEDIUM + DUTY

Fine water droplets polarize and attract in the electric field, progressively coalescing into larger drops that settle through the oil-water density difference.

PROJECT CONSIDERATIONS

REFINERY CRUDE PRETREATMENT

WASH-WATER MIXING + SALT TRANSFER

HIGH-VOLTAGE COALESCENCE

INTERFACE CONTROL + BRINE DISCHARGE

SYSTEM APPROACH

CONSIDER EQUIPMENT, PROCESS + CONTROL AS ONE BOUNDARY

Fine water droplets polarize and attract in the electric field, progressively coalescing into larger drops that settle through the oil-water density difference.

The equipment integrates with water injection, mixing, demulsifier dosing, and staged drainage to form a complete desalting and dehydration process.

Final configuration follows the project data sheet, technical agreement, and approved documents; website content does not replace engineering selection.

PROJECT VALUE

ENGINEER THE DETAILS FOR STABLE OPERATION

Clear inlet conditions, outlet targets, and control boundaries reduce the risk of equipment selection drifting away from the actual duty.

Sampling, draining, cleaning, maintenance, and abnormal-condition protection should be considered during design.

Retrofit projects also require confirmation of tie-ins, shutdown windows, plot constraints, and hazardous-area classification.

COMMON PROJECT QUESTIONS

What information should be provided first?+

Provide the medium, throughput, pressure and temperature range, inlet conditions, outlet targets, site utilities, and project stage.

Can the equipment be retrofitted into an existing unit?+

A retrofit can be assessed after confirming tie-ins, available space, shutdown window, control system, and existing equipment condition.

Are website values guaranteed performance?+

No. Guaranteed values are defined in the project data sheet and contract technical agreement after clarification.

Can controls be included?+

Instrumentation, valves, local controls, and DCS / SIS interfaces can be configured within the agreed supply boundary.

What delivery documents are available?+

The document scope can include drawings, data sheets, inspection records, test reports, operation and maintenance information, and packing lists.

How is delivery timing established?+

Schedule depends on technical input completeness, design approval, procurement, manufacturing, inspection, and transport conditions.